According to the requirements of the Notice of the General Office of the Ministry of Environmental Protection on the issuance of the Guidelines for the Disclosure of Government Information on Environmental Impact Assessment of Construction Projects (Trial) (Environmental Affairs Office [2013] No. 103),Public participation and information disclosure were carried out on the environmental protection acceptance of the completion of the 20,000 tons/year waste lead-acid battery recycling storage construction project of Yunnan Xianglong Renewable Resources Recycling and Utilization Co., LTD。
I. Basic information of the project
Project Name:Yunnan Xianglong Renewable Resources Recycling Co., Ltd. 20,000 tons/year waste lead-acid battery recycling storage construction project;
Construction unit:Yunnan Xianglong Renewable Resources Recycling Co., LTD.;
Construction address:Fortune Industrial Park, Xiangyun County, Yunnan Province;
Nature of construction:新建;
Construction content:The construction content of the project is mainly the main project (storage warehouse);Auxiliary works (office buildings);Public works (power supply, water supply, drainage, fire fighting, etc.);Environmental protection projects (waste water disposal facilities, waste gas disposal measures, noise prevention facilities, solid waste prevention measures, risk prevention facilities, etc.);
Construction scale:In the original high 8.5m, a total area of 1804㎡ steel frame structure warehouse, of which 802㎡ for zoning and ground, skirt Angle seepage treatment;After the partition is divided into waste lead-acid battery storage area and non-storage area, the storage area covers an area of 502 square meters。After completion, the project waste lead-acid battery transfer capacity of 20,000 tons/year, 30 tons/time, the maximum storage capacity of 30 tons;
Project investment:The estimated total investment of the project is 11.5 million yuan, of which the environmental protection investment is 350,000 yuan, and the environmental protection investment accounts for 0.03%;The actual total investment of the project is 11.58 million yuan, of which the investment in environmental protection is 430,000 yuan, accounting for 0 percent of the total investment.04%;
Scope of acceptance:The main project (storage warehouse) of the 20,000 tons/year waste lead-acid battery recycling storage construction project of Yunnan Xianglong Renewable Resources Recycling and Utilization Co., LTD.;Auxiliary works (office buildings);Public works (power supply, water supply, drainage, fire fighting, etc.);Environmental protection projects (waste water disposal facilities, waste gas disposal measures, noise prevention facilities, solid waste prevention measures, risk prevention facilities, etc.);
Environmental approval status during project construction:2018On February 13, Xiangyun County Development and Reform Bureau agreed to the project record, the record number is Xiangfa Reform investment record [2018]13;
2018February 11, Xiangyun Fortune Industrial Park Management Committee "On the Yunnan Xianglong Renewable Resources Recycling Co., Ltd. 20,000 tons/year waste lead-acid battery recycling storage construction project into the industrial park" Xiangfortune word [2018] No. 9;
2018In May, Henan Jiayu Environmental Technology Co., Ltd. completed the "Yunnan Xianglong Renewable Resources Recycling and Utilization Co., Ltd. 20,000 tons/year waste lead-acid battery recycling storage construction project Environmental Impact Report Form";
2018On July 30, the project obtained the approval of Xiangyun County Environmental Protection Bureau on the Environmental Impact Report Form of the 20,000 tons/year waste lead-acid battery recycling Storage Construction Project of Yunnan Xianglong Renewable Resources Recycling and Utilization Co., LTD.
2018On October 31, Xiangyun County Environmental Protection Bureau "Letter on the operation of hazardous waste during the trial operation of the 20,000 tons/year waste lead-acid battery recycling storage construction project of Yunnan Xianglong Renewable Resources Recycling and Utilization Co., LTD." Xianghuan Letter [2018] 44;
The project started construction on August 1, 2018, was completed on August 25, 2018, and was commissioned and operated on November 1, 2018。
To sum up,Yunnan Xianglong Renewable Resources Recycling Co., Ltd. 20,000 tons/year waste lead-acid battery recycling storage construction project implementation of the "construction project environmental protection management regulations" and other relevant laws and regulations,The EIA and approval documents are complete and the procedures are complete;At present,The main project and supporting environmental protection facilities are in normal operation。
2. Construction of environmental protection facilities
2.1废气
The exhaust gas produced during the operation period of the project is forklift exhaust gas, automobile exhaust gas, sulfuric acid fog。
(1) forklift exhaust gas, automobile exhaust gas
The storage process of waste lead-acid batteries in and out of the site requires forklift trucks, cars and other transportation equipment,Diesel powered,The operation process will produce a small amount of fuel exhaust gas,The exhaust gas is mainly generated during the start and operation of cars and forklifts,The main pollutants in the waste gas are hydrocarbons, carbon monoxide, nitrogen oxides and so on。Due to the small amount of forklift exhaust gas production and intermittent emission and the country has implemented the automobile exhaust standard limit, so the automobile exhaust pollutants are discharged to the standard。
(2) Sulfuric acid fog
The waste lead-acid batteries collected by the project are all from the waste lead-acid batteries replaced at each collection point, which will produce a small amount of sulfuric acid fog under the circumstances of unloading, temporary storage, external force impact during unloading, aging and damage of batteries, etc。
The project shall have an air collection and exhaust system according to the "Technical Specification for Pollution Control of waste lead acid Battery Treatment" (HJ519-2009),To filter and renew the air "requirements,Maintain a slight negative pressure in the project warehouse,And set up a set of exhaust air system,The waste gas such as sulfuric acid fog caused by the damage of waste lead-acid batteries is replaced,Update the whole warehouse air in time。
2.2废水
The drainage of the project adopts the rain and sewage diversion system, and has a supporting rainwater and sewage pipe network。
The wastewater generated during the operation period of the project is domestic sewage, and no production wastewater is generated。
The project does not involve hazardous waste processing,There's no open storage,Loading and unloading are carried out in the open air,No initial rain on the surrounding environment;The project adopts the drainage system of rain and sewage diversion.Modification of the drainage ditch in the site storage area,The anti-seepage drainage ditch will be constructed along the site boundary of the warehouse from south to northeast,The rainwater collected in the storage area is discharged into the newly built rainwater collection pond outside the factory building, and then treated by a set of oil-water separator for site greening and sprinkling and dust removal。
The project personnel produce domestic sewage,Relying on the existing one 50m3 septic tank pretreatment,Because the sewage network in the area where the project is located has not been connected,After the project sewage is discharged into the septic tank for treatment, it is regularly transported by the construction unit to the sewage treatment station of Yunnan Xiangyun Feilong Recycling Technology Co., Ltd. for in-depth treatment,non-efflux。
2.3噪声
The main source of project noise is the fan of exhaust system, vehicle transportation and loading and unloading noise。
The project reduces noise emission by installing vibration reduction foundation for noise production equipment, adopting soft connection for fan inlet and outlet, selecting low-noise equipment, reasonable layout, and prohibiting whistling。
2.4Solid waste
The solid waste generated during the operation period of the project is mainly domestic waste, plastic film scraps, leaked electrolyte, waste rags, waste protective appliances, waste acid-resistant and corrosion-resistant containers, etc. The specific disposal measures are as follows:
(1) plastic film scraps
Some plastic film waste will be produced in the storage process of the project. This part of plastic film waste is general solid waste, and the construction unit is responsible for transporting it to the plastic recycling workshop of Xiangyun Gaoxin Recycling Technology Co., LTD. 150,000 tons/year waste lead-acid battery recycling lead project for recycling。
(2) Leakage of electrolyte
In the storage process of the project, a certain amount of electrolyte will be generated from the waste lead-acid battery, which is mainly generated by the leakage of the waste lead-acid battery。According to the survey, the electrolyte content of waste lead-acid batteries is 10%~20% (this project takes20%As the leakage is accidental, after the leakage, the electrolyte is collected into the waste liquid collection pool through the diversion ditch set in the warehouse, and then transferred to the acid-resistant container after collection, and then entered the hazardous waste temporary storage room for a certain amount of temporary storage and sent to Yunnan Xiangyun Feilong Recycling Technology Co., Ltd. for disposal on a regular basis。
(3) Waste rags, waste protective appliances, waste acid-resistant corrosion resistant containers
To keep the warehouse floor clean during the operation of the warehouse project,Regular use of rags, mops to remove a small amount of dust remaining on the surface,This process will produce a certain amount of waste cloth, waste mop,Hazardous waste;Project employees are required to wear protective clothing when working with lead-acid batteries,The replaced protective clothing is hazardous waste;The acid-resistant and corrosion-resistant containers used to store the electrolyte are plastic products,It will be damaged after a period of use,Damaged acid-resistant and corrosion-resistant containers are hazardous waste。The leaked electrolyte, waste rags, waste mops, waste protective clothing and waste acid-resistant and corrosion-resistant containers generated in the above process of the project are collected in the hazardous waste temporary storage room and sent to Yunnan Xiangyun Feilong Recycling Technology Co., Ltd. for disposal on a regular basis。
(4) Domestic waste
The domestic waste generated by the project staff is uniformly collected into the garbage collection bucket in the project area, and is regularly removed by the management committee of Xiangyun Fortune Industrial Park to the Xiangyun County Waste Treatment Plant for disposal。
The solid waste disposal rate during the operation of this project is 100%。
2.5Other environmental protection measures
Environmental risk prevention facilities (seepage prevention measures)
The project has prepared an emergency plan for environmental emergencies and filed it with the Environmental Protection Bureau of Xiangyun County on July 10, 2019 (filing number: 532923-2019-019-L).。According to the "Yunnan Xianglong Renewable Resources Recycling and Utilization Co., LTD. 20,000 tons/year waste lead-acid battery recycling storage construction project warehouse (anti-corrosion and anti-seepage) project supervision report" : the project storage warehouse uses ground compaction, clay layer rolling,The thickness of the clay layer is greater than 1 meter;The clay layer is coated with impermeable (waterproof) coil (high-density polyethylene film) thickness 1.5mm,The waterproof coil layer is hardened with C30P6 concrete to prevent seepage,Concrete thickness 20cm;Three layers of fiberglass cloth are then laid over the concrete layer,After four layers of epoxy resin, 3mm thick asphalt is used for anti-corrosion;The asphalt is surrounded with 30cm concrete;The top is lined with two layers of fiberglass cloth,Three coats of epoxy followed by asphalt paint,The anti-seepage performance can reach < 10-10cm /s。The construction quality of anti-corrosion and anti-seepage works of underground structures of the project can be independently checked and inspected according to the current construction quantity acceptance specifications and project environmental impact assessment report form, so as to achieve the construction quality objectives and meet the requirements of acceptance specifications and hazardous waste storage requirements。The project has been carried out anti-corrosion and anti-seepage treatment in strict accordance with the requirements of "Hazardous Waste Storage Pollution Control Standard" (GB18597-2001) and 2013 amendment order。
Third, environmental protection facilities commissioning operation effect
3.1Pollutant discharge
3.1.1废气
Monitoring Period (14-15 May 2019),The project will set up 4 unorganized emission monitoring points at the plant boundary,Where: Upwind set reference point FQ01#,The monitoring points FQ02#, FQ03# and FQ04# are set downwind,The maximum emission concentration of sulfuric acid fog in 4 monitoring points was 0.098mg/m3, in line with the unorganized emission monitoring concentration limit in Table 2 of GB16297-96 "Air Pollutant Emission Standard";Namely: sulfuric acid fog ≤1.2mg/m3。The factory boundary is not organized to meet the emission standards。
3.1.2Plant boundary noise
During the acceptance monitoring period, the four monitoring points of the project were monitored for two consecutive days (May 14-15, 2019). It was learned that the maximum monitoring value of the four monitoring points Z01#, Z02#, Z03# and Z04# for two consecutive days was 63.1dB. Night monitor maximum 53.3dB, all up to GB12348-2008 "Industrial Enterprise boundary environmental noise emission standards" in the 3 standard limits (day ≤65dB, night ≤55dB) requirements;Project plant boundary noise emission standard。
3.1.3Solid waste
The solid waste generated during the operation period of the project is mainly domestic waste, plastic film scraps, leaked electrolyte, waste rags, waste protective appliances, waste acid-resistant and corrosion-resistant containers, etc. The specific disposal measures are as follows:
(1) plastic film scraps
Some plastic film waste will be produced in the storage process of the project. This part of plastic film waste is general solid waste, and the construction unit is responsible for transporting it to the plastic recycling workshop of Xiangyun Gaoxin Recycling Technology Co., LTD. 150,000 tons/year waste lead-acid battery recycling lead project for recycling。
(2) Leakage of electrolyte
In the storage process of the project, a certain amount of electrolyte will be generated from the waste lead-acid battery, which is mainly generated by the leakage of the waste lead-acid battery。According to the survey, the electrolyte content of waste lead-acid batteries is 10%~20% (this project takes20%As the leakage is accidental, after the leakage, the electrolyte is collected into the waste liquid collection pool through the diversion ditch set in the warehouse, and then transferred to the acid-resistant container after collection, and then entered the hazardous waste temporary storage room for a certain amount of temporary storage and sent to Yunnan Xiangyun Feilong Recycling Technology Co., Ltd. for disposal on a regular basis。
(3) Waste rags, waste protective appliances, waste acid-resistant corrosion resistant containers
To keep the warehouse floor clean during the operation of the warehouse project,Regular use of rags, mops to remove a small amount of dust remaining on the surface,This process will produce a certain amount of waste cloth, waste mop,Hazardous waste;Project employees are required to wear protective clothing when working with lead-acid batteries,The replaced protective clothing is hazardous waste;The acid-resistant and corrosion-resistant containers used to store the electrolyte are plastic products,It will be damaged after a period of use,Damaged acid-resistant and corrosion-resistant containers are hazardous waste。The leaked electrolyte, waste rags, waste mops, waste protective clothing and waste acid-resistant and corrosion-resistant containers generated in the above process of the project are collected in the hazardous waste temporary storage room and sent to Yunnan Xiangyun Feilong Recycling Technology Co., Ltd. for disposal on a regular basis。
(4) Domestic waste
The domestic waste generated by the project staff is uniformly collected into the garbage collection bucket in the project area, and is regularly removed by the management committee of Xiangyun Fortune Industrial Park to the Xiangyun County Waste Treatment Plant for disposal。
The solid waste disposal rate during the operation of this project is 100%。
4. Publicity time
201910 July - 6 August 2019 (excluding holidays)。
5. Major matters for soliciting public opinions
This publicity is mainly to solicit ideas and suggestions on environmental protection work after the completion of the project, to understand the impact of the project on all aspects of society and the true attitude and ideas of the public, and to effectively protect the interests of affected people by understanding public opinions。
6. Main ways for the public to express their views
After the publicity of this information, the public can express their opinions on the construction and acceptance of the project by sending email, telephone, letter or interview to the designated address。
7. Feedback methods
Yunnan Xianglong renewable resources recycling Co., LTD
Address: Fortune Industrial Park, Xiangyun County, Yunnan Province
Contact: Pu Jianfeng 13577225252
Yunnan dust clean environmental monitoring Co., LTD
Address: Kanghai Road, Kungang, Anning City, Kunming, Yunnan Province
Contact: Chen Jie 13888486684
Email: 747349415@qq.com